Finding a suitable site for the new Christian Girls Home has been a challenge to say the least. So homes and buildings are built on the side of hills and good roads are few and far between.
|
| That being said, we feel very fortunate to have found a suitable location. It has an existing structure that will have to be altered. The property faces the only paved road in Moron which is a big plus. The property does have a grade (slope) to it, but not as challenging as many other properties we visited. |
|
| Our current plans are to alter the existing structure. The prepare the site and foundation to sustain a two story facility. Once the foundation has been laid, we will built the first level. Then as funds become available we will add on with the second level. |